So, here's what I have been doing for a coupla weekends. Not bad for a crippled 60 year old, me and a bad back, and a retired SF Engineer! Plans are an apartment on top, shed/shop downstairs for when I begin the cabin. We had the first floor walls and second floor down the first day, second floor walls and half the rafters up the second day. We was whooped, fell short of having the roof done by day 2. We spent this last weekend doing the roof and stairs (2 of us). Happy with how things turned out. Windows and doors come next, then the wiring, plumbing, insulation, and sheet rock. Should be liveable by the end of July.
More pics to follow.