Been a busy couple months for me......
New fork seals and fluid change.
CCS Cruise Control Installed.
Replaced all coolant hoses, o rings and thermostat. (obviously a flush with that)
Switch Back LED front turn signals.
R&G Racing frame sliders installed.
Auxbean LED head lights.
Wireless phone charger.
Steve's Shoodaben Engineering Mountain Runner ECU Flash
Replaced fuel filter pick up sock.
Oil change in final drive
Engine oil change and filter
New air filter.
Checked TB Sync
Cleaned and lubed the windshield mechanism and cables.
New Tires F&R (T30s)
Bleed F&R brakes
Bleed clutch slave
Bought new brake pads but will wait a little longer on those.
Think that's it